Offerton High School

The project

The overall project comprised the installation of a temporary sports hall. The foundations were installed using specialist formwork due to the ground levels. The temporary building was made from an aluminum frame, installed wall panels and a twin walled PVC roof that was inflated on site. The frame and components were produced off site and then built on site.

The flooring installed is a metal cassette mezzanine floor that used OSB board and plywood on top and then finished using Tarkett Sports Flooring to complete it. We also installed Fermosel Walling to create a sports wall specification, this comprised of metal studwork and two layers of Fermosel boards to the Sports Hall side and a single layer to the reception side with acoustic insulation in between.

A reception area was also installed. The overall project was completed in 8 weeks.

Gallery

Photographs

Tenders · frameworks · direct appointments

Got a scheme coming up?

Talk to the directors who'll actually deliver it. We price quickly, we answer RFIs quickly, and we'll tell you straight if it isn't right for us.

Concept design · not the official website